We deliver utility-scale ground-mount projects on flat land and on hilly slopes — site survey, geotechnical, civil, mounting structure, DC and AC side works, grid synchronisation, and SCADA. One EPC team, one warranty chain, one accountable schedule.
Every discipline below is staffed in-house — design, project management, civil and electrical crews, commissioning engineers. You get one accountable schedule, not a chain of subcontractors.
PVSyst-based yield study, single-line diagram, string sizing, mounting-structure design, civil foundation drawings, earthing and lightning protection design.
Site grading, pile driving or ballasted foundations, MMS installation, module mounting and tracker commissioning where applicable.
Module DC cabling, string combiner boxes, central or string inverters, LT/HT panels, transformer yard, RMU and switchyard up to the DISCOM interface.
Plant-level SCADA with string-level monitoring, weather station, generation and performance-ratio dashboards, alarms to mobile and email.
DISCOM connectivity, CEIG, MNRE portal filings, state nodal agency submissions, project commissioning reports and COD documentation.
Signed AMC from COD — module cleaning cycles, IV curve tests, inverter health, spares, vegetation control and quarterly generation reports.
A solar plant is a 25-year asset. We pick components that survive that, and we publish the BoM in the proposal so you can audit it.
Mono-PERC / TOPCon half-cut modules from listed tier-1 OEMs, with 12-year product warranty and 25-year linear performance warranty.
String or central inverters from listed tier-1 OEMs sized for the project — with built-in DC isolators, MPPT per string and grid-support functions.
Larger plants run longer because of switchyard and transmission line works — but the sequence stays the same.
Site survey, geotechnical, shadow analysis, PVSyst yield study, BoM freeze.
DISCOM connectivity, CEIG, MNRE filings, component ordering and logistics.
Site grading, piling, MMS erection, structure alignment and QA.
Module mounting, DC cabling, inverter + transformer yard, switchyard, SCADA.
Synchronisation, CEIG inspection, COD declaration, AMC kicked off.
Share the site location, approximate acreage, terrain and the DISCOM zone you're in. We respond with a visit plan and a first-pass budget within 3 working days.
A short note from you saves a round-trip — land location, terrain, expected MW, and your timeline.
If you're still evaluating sites, we can give you a per-MW benchmark range over a 20-minute call — no commitment, no NDA required.